warehouse structure Distribusi & Workshop Logistik
Bentang bersih 24 meter tanpa kolom tengah untuk keleluasaan manuver forklift dan loading barang, dilengkapi konsol crane hoist 5 ton.

Heavy structural steel construction · Bali, Indonesia
From the first idea to a structure that stands strong.
TUKANG UNITED delivers heavy structural steel fabrication and erection for commercial, industrial, and hospitality projects in Bali.
01 / Keahlian kami
The strength of steel, precisely designed around your building’s function and character—from preparation through installation.
A foundation for big ambitions. Primary steel structures for commercial and industrial buildings.
Explore serviceFrom shop drawings to steel components. Every cut, connection, and detail has a purpose.
Explore serviceBringing field components together through a planned installation sequence and coordination.
Explore service
02 / Cara kami berpikir
Efficient production space. Characterful villas. Commercial spaces ready to grow. Every function needs a different structural approach.
03 / Room for your vision
04 / From discussion to construction
Building function, site conditions, and project goals become the starting point.
Scope, drawings, specifications, and stages are aligned before work begins.
Components are prepared and assembled according to the installation sequence.
Inspection and documentation form the basis for handover.
05 / Close to your project
From city centers to coastal sites. Understand the construction considerations in your project area.
Explore all areas06 / Notes from the construction world
Review scope, communication, and work references before choosing a partner.
Read articleDiscuss function, building conditions, access, and comfort before adding a floor.
Read articleKeep records, report changes, and create traceable follow-up actions.
Read articleBukti Lapangan
Dokumentasi teknis fabrikasi dan steel erection di berbagai wilayah Bali — dari wide span industrial hingga presisi arsitektur vila tropis.
Bentang bersih 24 meter tanpa kolom tengah untuk keleluasaan manuver forklift dan loading barang, dilengkapi konsol crane hoist 5 ton.
Struktur hybrid baja ekspos dipadukan bukaan wide glass facades dan balkon kantilever 3.5 meter menghadap sawah. Fabrikasi presisi tinggi untuk estetika arsitektur.
Penambahan lantai gantung mezzanine di dalam ruko eksisting tanpa merusak pondasi lama. Waktu instalasi 14 hari kerja dengan gangguan minimal pada operasional.
Struktur atap gantung tanpa tiang depan untuk area drop-off resort tebing pantai. Menggunakan proteksi anti-korosi standar C4 High Durability terhadap uap garam.
Simulasi Instan
Dapatkan gambaran awal tonnage estimation baja, rekomendasi profil, dan durasi pengerjaan sebelum survei teknis ke lokasi.
Kalkulasi parameter indikatif proyek Anda:
*Estimasi di atas adalah simulasi awal parameter teknik lapangan, bukan penawaran kontrak final.
Start with your needs. We will map the next steps.