Stage 01
Brief & space requirements
Start with building function, location, approximate dimensions, and intended use date. Explain expansion plans, special equipment, and designers already involved. The brief separates essential needs from items still open to development.
Stage 02
Review project conditions
Identify vehicle access, storage, site conditions, and neighboring buildings. Existing structures need condition information. Record missing data so it can be completed before technical decisions.
Stage 03
Align drawings & scope
Drawings, specifications, boundaries, cost assumptions, and schedules should use the same references. Clearly assign responsibility for foundations, anchors, framing, roofing, utilities, and architectural work.
Stage 04
Prepare fabrication
Shop drawings guide material preparation, cutting, drilling, connections, and coatings according to scope. Component marks and dimensional checks connect workshop work with the installation sequence.
Stage 05
Coordinate installation
Align foundation readiness, delivery access, equipment areas, and erection sequence. Site coordination follows methods and safety plans prepared by qualified parties. Record and review site changes.
Stage 06
Inspect & document
Final inspections follow agreed scope and specifications. Completion lists, change records, and maintenance information support closeout. Handover documents explain results and responsibility boundaries.