TUKANG
UNITEDSTEEL CONSTRUCTION
Discuss Project

Work Process steel construction · TUKANG UNITED

Every Stage Engineered
for Precision.

From the first conversation to final documentation. Understand the information, decisions, and coordination needed throughout steel construction.

Discuss your needs

Stage 01

Brief & space requirements

Start with building function, location, approximate dimensions, and intended use date. Explain expansion plans, special equipment, and designers already involved. The brief separates essential needs from items still open to development.

Stage 02

Review project conditions

Identify vehicle access, storage, site conditions, and neighboring buildings. Existing structures need condition information. Record missing data so it can be completed before technical decisions.

Stage 03

Align drawings & scope

Drawings, specifications, boundaries, cost assumptions, and schedules should use the same references. Clearly assign responsibility for foundations, anchors, framing, roofing, utilities, and architectural work.

Stage 04

Prepare fabrication

Shop drawings guide material preparation, cutting, drilling, connections, and coatings according to scope. Component marks and dimensional checks connect workshop work with the installation sequence.

Stage 05

Coordinate installation

Align foundation readiness, delivery access, equipment areas, and erection sequence. Site coordination follows methods and safety plans prepared by qualified parties. Record and review site changes.

Stage 06

Inspect & document

Final inspections follow agreed scope and specifications. Completion lists, change records, and maintenance information support closeout. Handover documents explain results and responsibility boundaries.

Have a bold vision?
Let us give it structure.

Start with your needs. We will map the next steps.

Start your project
WhatsApp Consultation
Calculate Estimate Chat WhatsApp